Tlicho Road
Location: Northwest Territories
Installation of 14-inch-diameter bridge abutment piles for 3 bridges, 20 to 25 meters in length; Arctic Grouting of piles in permafrost conditions.
Ten-Mile Slide Slope Stabilization
Location: Lillooet, British Columbia
Installation of 44 concrete blocks with No. 18 DCP anchors at an average depth of 115 feet. The active slide portion is 650 feet wide, 1,000 feet long and has approximately 1.3 million cubic yards of material.
PIIC Micropiles
Location: British Columbia and Alberta
Foundations West Construction has the expertise and versatility to handle any foundations project in Western Canada, no matter the size or complexity. We deliver cost-efficient solutions with top-of-the-line specialty equipment.
Southwest Calgary Ring Road
Location: Calgary, Alberta
Over 150 drilled shafts, 3 to 7 feet in diameter, were installed for highway guide signs, high mast lighting and structural abutments.
KLTP Drilled Shafts
Location: Burnaby, British Columbia
606 drilled shafts with sizes varying from 24 to 48 inches in diameter and an average length of 10.5 linear meters. These utilize both segmental cased drilling and open hole drilling with conventional liners.
Micropiles and Anchors
Location: Bowen Island, British Columbia
Installation of cased 8-inch-diameter pipe pile foundations and 34 No. 8 DCP anchors for permanent shotcrete wall.
Arbutus Rock Anchor Installation
Location: Victoria, British Columbia
Installation of 208 12-meter deep foundation rock anchors.
Dewatering Wells
Location: Squamish, British Columbia
Cased drilled holes up to 40 feet deep and installed perforated dewatering well screens.
Suterbrook Anchors
Location: Port Moody, British Columbia
Installation of 74 hollow anchors with simultaneous grout flushing up to 56 feet deep for the shoring scope of an underground parkade.